Do you cover the South West?
Yes — Swindon and the M4 corridor, Bristol, Bath, Gloucester, Cheltenham, Chippenham, Wiltshire, Somerset, Taunton, Exeter, Devon and Cornwall.
How fast can you reach a South West site?
Swindon, Bristol, Bath and Gloucestershire are close to our Oxfordshire base and are routine allocations. Further west, programmes are planned with allocated crews and equipment from a fleet of around 150 vehicles. Emergency call-out cover is 24 hours a day, seven days a week.
How much does traffic management cost in the South West?
It depends on the road type, the arrangement — closure, signals, stop-go or convoy — the equipment on hire, the duration, the crew requirement and travel to site, plus authority permit or TTRO fees. Rural stop-go with several operatives is priced differently from a set of portable signals, so we quote in writing per scheme.
Is emergency traffic management available in the South West?
Yes, 24/7 rapid-response call-outs for burst mains, carriageway failures, collisions and damaged temporary traffic management.
Can you work on narrow lanes in Devon and Cornwall?
Yes, and it is usually stop-go or convoy working rather than closure, because a rural closure can add many miles and push HGVs onto unsuitable lanes. Shuttle length, sight lines and operative numbers are set by the road itself.
Can you work on the M4 and M5?
Yes. Motorway schemes are delivered under Sector Scheme 12D registration by ticketed crews, in windows agreed with National Highways, with correct taper lengths, safety zones and advance signing.
Do you handle permits and TTROs in the region?
Yes, end to end with each relevant authority, including permit applications, Temporary Traffic Regulation Orders, notice periods and conditions, with approval confirmed in writing before you mobilise.
Can you work in Bath and central Bristol?
Yes. Those schemes are dominated by narrow historic streets, gradients and heritage constraints, so the pedestrian arrangement and what can be fixed to the ground drive the design, and drawings are prepared for the specific street rather than a template.
Do you work nights in the South West?
Yes, on motorway corridors and busy city routes where daytime occupation is restricted. Night schemes are planned as night shifts, with lighting and conspicuity designed in.
What accreditations and insurance do you hold?
Sector Scheme 12 registration across 12A to 12D, Chapter 8 and NRSWA compliance, Constructionline, BM Trada, CHAS, Acclaim, Achilles UVDB, SafeContractor and ISO 9001, with £10 million public liability and £10 million employers' liability.