How much does a TTM design cost?
Design fees depend on the complexity of the scheme, the number of phases and drawings required, whether a diversion route has to be surveyed and signed, and how much authority liaison the approval needs. A single-phase footway closure is a small piece of work; a multi-phase high street scheme with a diversion is not. We quote per scheme in writing.
How long does it take to get a drawing approved?
The design itself is usually the quicker part. Authority approval and the associated permit or order notice periods dominate the timeline and vary by authority and works type, with TTROs taking the longest. The practical advice is to start design as soon as you have an indicative programme.
Can you design a scheme that another contractor will install?
Yes. Drawings are produced clearly enough for any competent traffic management contractor to build, with sign schedules, dimensions and sequences specified rather than implied. We will tell you honestly where a detail depends on judgement on the day.
What if the authority rejects the design?
We handle the comments and the revision as part of taking the scheme through approval — that is the point of us owning the conversation rather than passing it to you. Where an authority requires a materially different arrangement, we explain the programme and cost implications before proceeding.
Do you handle permits and TTROs as well as the design?
Yes. Authority liaison is handled end to end: permit applications, Temporary Traffic Regulation Orders, notice periods, consultation and council sign-off, all aligned with the approved drawing so documents and dates match.
Do you need to visit the site to design a scheme?
For anything other than the simplest arrangements, yes, and it is what stops a drawing being unbuildable. Available width, sight lines, accesses, street furniture and existing controls are frequently not what mapping suggests, and diversion routes should be driven before they are signed.
What standards do you design to?
Chapter 8 of the Traffic Signs Manual, the New Roads and Street Works Act framework, and Sector Scheme 12 across 12A, 12B, 12C and 12D. We also hold ISO 9001 along with Constructionline, CHAS, SafeContractor, Achilles UVDB, Acclaim and BM Trada.
Can you redesign a scheme that is already on site and not working?
Yes, and it is a common call. We review the installed arrangement against the approval, identify what is causing the problem — usually siting, timings, phasing or pedestrian provision — and produce a revised design and approval rather than continuing to adjust it on the day.
Will the same team deliver the scheme they designed?
If you want us to, yes, and it is the arrangement we would recommend. Design and delivery in one business removes the gap where site conditions get lost between the drawing and the crew.
Which areas do you design schemes for?
Anywhere we work, which is nationwide: Oxfordshire and Oxford, London and all boroughs, the South East, Gatwick, the South West, Wales, the Midlands, the North and Scotland. Authority processes differ by area, which is part of what we handle for you.